Barge Masters, Barge Engineers, Ballast Control Room Operators and those ashore responsible for the loading and ballasting of both semi-submersibles and jack-up units will find this volume of particular interest. It is designed to be used both as theoretical background on the principles of stability management and as a guide to the operational daily management of afloat stability on these specialist vessels.
Part 1